1208/ pictures Bryan took on his 2012 survey trip with Robin 2407/ pictures from July 2024 survey trip with ocs1999 2409/ pictures from September 2024 trip to build fence, talk to Todd Vejraska, and build the trailer/shop electrical service entrance 2410/ pictures from October 2024 trip to build trailer pilings 2503/ pictures from after trailer was installed. I took these as I left after working on the trailer for a week. cattle/ cattle on the land, 26.01.23 shopGrading/ grading of area in front of trailer where shop went, done 26.03.03-05 shopGrading/beforeWest western part of area before grading, taken from trailer porch. Excavator is in the corner. Green paint on ground shows edge of area to be graded. Yellow markers show corners of shop location. shopGrading/beforeEast eastern part of area before grading, taken from trailer porch. shopGrading/excavator1 shopGrading/excavator1 excavator used to pull up the brush and dig the pit shopGrading/begin project begins shopGrading/clearedSouth shopGrading/clearedNorth brush clearing is done, looking south and north respectively shopGrading/digging excavating pit to get soil for raising grade. Test strip at new grade is on right; the top of the pink stakes is the new grade. shopGrading/finalSE shopGrading/finalNE project finished, looking southeast and northeast, respectively shopGrading/pit the finished pit. The purpose of the pit was to supply soil to raise the grade of the rest of the area. I had actually envisioned a valley, for minimum width, but I think the flat bottom was easier to dig and is probably more useful anyway. The orange stones on the left mark where the telephone line is buried. trailer/ pictures of the trailer home trailer/driveway view of driveway where it splits into the loop 25.07.12 trailer/front trailer, car, and clothes line from the front 25.07.12 trailer/front2 trailer from the front 25.07.13 trailer/back trailer site from behind 25.07.12 trailer/east east end of trailer site 25.07.12 trailer/west west end of trailer site 25.07.13 trailer/firebreakBack trailer, site from the back after firebreak cleared 25.09.16 trailer/firebreakFront trailer, car from the front after firebreak cleared 25.09.16 trailer/interior/ interior of trailer after everything was settled, 25.11.02